Measure the work. Check the materials. Understand the quotation.Explore the global TB platform
FREE METRIC DEMOS

Check the formula behind the material subtotal.

Calculate slab volume, whole blocks and tile boxes with editable MYR example rates.

EDIT THE INPUTS

Measure. Allow. Round. Review.

Default quantities: 12.6 m³ of concrete, 342 blocks and 23 tile boxes. Material-only examples, not complete installed quotations.

Concrete slab: quantity & material cost

Adjust the dimensions, allowance and example rate. Review the formula behind the result.

MYR rates are illustrative editable inputs, not Malaysia market averages or supplier quotations. Review the actual product, allowance and delivery basis.

L × W × T
EXAMPLE MATERIAL SUBTOTAL
—

Build a detailed estimate in TB

This demo runs in your browser. Inputs are not saved or automatically transferred into a TB project.

UNDERSTAND THE LIMIT

One material calculation at a time.

Concrete

Uniform rectangular slab; foundations and associated work are separate.

Blocks

Net area divided by nominal face area, with allowance and rounding.

Tiles

Floor area with allowance divided by actual box coverage.

Use actual project information

Confirm dimensions, specification, allowance and quote inclusions before ordering. Rates are illustrative. Demo inputs stay in the browser without automatic saving or transfer.

Explore main TB calculators

BEFORE THE NEXT RENOVATION QUOTE OR MATERIAL ORDER

Build a clearer basis for the next material order.

Explore quantities, material purchasing, editable costs and resources in TrendyBuilders. Choose capacity for your own work or a team.

Make every allowance explainable.See plans