HOME EXTENSIONS · MEASURED WORK

Measure the slab without losing the rest of the extension.

Separate the simple concrete quantity from foundations, interfaces and associated work.

TrendyBuilders editorial team · Reviewed 29 November 2026 · Worked examples

Define what the quantity represents

An extension estimate can include new construction, changes to existing work and connections between them. Mark the drawing revision and the exact element measured. A floor footprint cannot describe every item in the project.

Work through the uniform slab

The metric demonstration uses a rectangle 10 m long, 8 m wide and 150 mm thick. Convert thickness to 0.15 m before multiplication: 10 × 8 × 0.15 = 12 m³. With the chosen 5% allowance, the planning quantity becomes 12.6 m³.

At illustrative MYR300 per m³, the concrete-material subtotal is MYR3,780. This is not a Malaysian supplier quotation, a design thickness or a recommended ordering allowance. Use the actual project details and agreed purchase basis.

Keep associated work in separate lines

Review excavation, preparation, foundations, thickened edges, reinforcement, formwork, labour, pumping and delivery. Record existing-work interfaces and making good where applicable. A larger allowance cannot explain a missing element or replace a professional decision.

Make revisions understandable

If the same 12.6 m³ is priced at illustrative MYR320 instead, its subtotal becomes MYR4,032: MYR252 higher with no quantity change. Showing quantity and rate separately helps explain the reason for a revised total.

  • Record source dimensions and units.
  • Identify irregular shapes separately.
  • Show allowance apart from measured volume.
  • Confirm product specification and delivery basis.
  • Leave unresolved details visible for review.

The calculation supports a discussion about material quantity. It does not confirm whether the proposed extension, structural detail or construction method is suitable or authorised. Review those matters with the responsible professionals.

Explore a detailed estimate in TB

BEFORE THE NEXT RENOVATION QUOTE OR MATERIAL ORDER

Build a clearer basis for the next material order.

Explore quantities, material purchasing, editable costs and resources in TrendyBuilders. Choose capacity for your own work or a team.

Make every allowance explainable.See plans